Cameron Highway Oil Transport System was discovered in Gulf of Mexico in 2004 and production from
by operator Enterprise Oil.
Cameron Highway Oil Transport System, USA
Subsea Field Development Data:
Area:
Gulf of Mexico
Block:
332 hub
Country:
USA
Region:
America(North)
Operator:
Enterprise Oil
Partners:
Topside Solution:
Cameron Highway Oil Transport SystemSubsea Tieback
Subsea Solution:
Development Cost:
$60 million
Oil Gas Reserves:
Cameron Highway Oil Transport System, Enterprise Oil[/b], - system is a deepwater crude oil transport system with a capacity of 600,000b/d. It stands as the longest offshore oil pipeline in the US, measuring in excess of 390 miles.
The Cameron Highway Oil Transport System field development by operator Enterprise Oil is located 332 hub in Gulf of Mexico offshore USA
in water depths of .
Enterprise Oil with its partners started development of the Cameron Highway Oil Transport System field in 2004.
The recoverable reserves are estimated to . Number of subsea wells are . The production year is
with a daily production estimate of 600,000b/d. The Cameron Highway Oil Transport System project is based on a
subsea solution with Cameron Highway Oil Transport SystemSubsea Tieback topside solution. The development cost is in the order of $60 million with an estimated field life of years.
Cameron Highway Oil Transport System
Technical Information:
No of Wells:
Crude:
Water Depth:
Design Pressure:
Design Temperature:
Field Life:
Cameron Highway Oil Transport System Project Status:
Daily Production: 600,000b/d
Field Status:
Check back frequently for updated subsea oil and gas project info.
var txt = "Bookmark the Subsea Oil and Gas Directory";
var url = "index.htm"/*tpa=http://İnternet Adresi: www.subsea.org/*/;
var who = "Subsea Oil and Gas Directory - All Subsea Information";
var ver = navigator.appName;
var num = parseInt(navigator.appVersion);
if ((ver == "Microsoft Internet Explorer")
by operator Enterprise Oil.
Cameron Highway Oil Transport System, USA
Subsea Field Development Data:
Area:
Gulf of Mexico
Block:
332 hub
Country:
USA
Region:
America(North)
Operator:
Enterprise Oil
Partners:
Topside Solution:
Cameron Highway Oil Transport SystemSubsea Tieback
Subsea Solution:
Development Cost:
$60 million
Oil Gas Reserves:
Cameron Highway Oil Transport System, Enterprise Oil[/b], - system is a deepwater crude oil transport system with a capacity of 600,000b/d. It stands as the longest offshore oil pipeline in the US, measuring in excess of 390 miles.
The Cameron Highway Oil Transport System field development by operator Enterprise Oil is located 332 hub in Gulf of Mexico offshore USA
in water depths of .
Enterprise Oil with its partners started development of the Cameron Highway Oil Transport System field in 2004.
The recoverable reserves are estimated to . Number of subsea wells are . The production year is
with a daily production estimate of 600,000b/d. The Cameron Highway Oil Transport System project is based on a
subsea solution with Cameron Highway Oil Transport SystemSubsea Tieback topside solution. The development cost is in the order of $60 million with an estimated field life of years.
Cameron Highway Oil Transport System
Technical Information:
No of Wells:
Crude:
Water Depth:
Design Pressure:
Design Temperature:
Field Life:
Cameron Highway Oil Transport System Project Status:
Daily Production: 600,000b/d
Field Status:
Check back frequently for updated subsea oil and gas project info.
var txt = "Bookmark the Subsea Oil and Gas Directory";
var url = "index.htm"/*tpa=http://İnternet Adresi: www.subsea.org/*/;
var who = "Subsea Oil and Gas Directory - All Subsea Information";
var ver = navigator.appName;
var num = parseInt(navigator.appVersion);
if ((ver == "Microsoft Internet Explorer")