Hayatimdegisti.com kişisel gelişim ritmotrans telkinli Cd'leri

Hayatimdegisti.com kişisel gelişim ritmotrans telkinli Cd'leri (http://www.hayatimdegisti.com/forum/index.php)
-   Yurtdışı Firmalar (http://www.hayatimdegisti.com/forum/yurtdisi-firmalar/)
-   -   PM-3 Commercial Arrangement Area (CAA) Field Development (http://www.hayatimdegisti.com/forum/yurtdisi-firmalar/540794-pm-3-commercial-arrangement-area-caa-field-development.html)

Bluesky24 19-04-2010 10:53 AM

PM-3 Commercial Arrangement Area (CAA) Field Development
 




PM-3 Commercial Arrangement Area (CAA) was discovered in Indonesia in 1997 and production from 2004

by operator Talisman.









PM-3 Commercial Arrangement Area (CAA), Malaysia

Subsea Field Development Data:









Area:

Indonesia







Block:









Country:

Malaysia







Region:

Asia







Operator:

Talisman







Partners:

Talisman Malaysia (41.44%), Petronas Carigali (46.06%), PetroVietnam (12.5%)







Topside Solution:

PM-3 Commercial Arrangement Area (CAA)FPSO









Subsea Solution:









Development Cost:









Oil Gas Reserves:

















PM-3 Commercial Arrangement Area (CAA), Talisman[/b], - Phases 2 and 3 of the PM-3 Commercial Arrangement Area (CAA) project are being carried out offshore Malaysia/Vietnam. Phase 1 oil production commenced in July 1997. Phases 2 and 3 achieved peak production early 2004.

























The PM-3 Commercial Arrangement Area (CAA) field development by operator Talisman is located in Indonesia offshore Malaysia

in water depths of .





Talisman with its partners started development of the PM-3 Commercial Arrangement Area (CAA) field in 1997.

The recoverable reserves are estimated to . Number of subsea wells are 2. The production year is

2004 with a daily production estimate of 60,000bbls/d. The PM-3 Commercial Arrangement Area (CAA) project is based on a

subsea solution with PM-3 Commercial Arrangement Area (CAA)FPSO topside solution. The development cost is in the order of with an estimated field life of years.



















PM-3 Commercial Arrangement Area (CAA)

Technical Information:





No of Wells:

2





Crude:







Water Depth:







Design Pressure:







Design Temperature:







Field Life:













PM-3 Commercial Arrangement Area (CAA) Project Status:



Daily Production: 60,000bbls/d





Field Status:













Check back frequently for updated subsea oil and gas project info.







var txt = "Bookmark the Subsea Oil and Gas Directory";

var url = "index.htm"/*tpa=http://İnternet Adresi: www.subsea.org/*/;

var who = "Subsea Oil and Gas Directory - All Subsea Information";

var ver = navigator.appName;

var num = parseInt(navigator.appVersion);

if ((ver == "Microsoft Internet Explorer")


WEZ Format +3. Şuan Saat: 02:07 PM.

Powered by vBulletin® Version 3.8.8
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.