Hayatimdegisti.com kişisel gelişim ritmotrans telkinli Cd'leri

Hayatimdegisti.com kişisel gelişim ritmotrans telkinli Cd'leri (http://www.hayatimdegisti.com/forum/index.php)
-   Yurtdışı Firmalar (http://www.hayatimdegisti.com/forum/yurtdisi-firmalar/)
-   -   Kashagan Field Development (http://www.hayatimdegisti.com/forum/yurtdisi-firmalar/540221-kashagan-field-development.html)

Bluesky24 19-04-2010 01:25 AM

Kashagan Field Development
 




Kashagan was discovered in Caspain Sea in 2000 and production from 2009

by operator ENI.









Kashagan, Kazakhstan

Subsea Field Development Data:









Area:

Caspain Sea







Block:









Country:

Kazakhstan







Region:

Asia







Operator:

ENI







Partners:

ENI 18.52%,

ExxonMobil 18.52%,

Total 18.52%,

Shell 18.52%,

ConoccoPhillips 9.26%,

KazMunaiGaz 8.33%,

Inpex 8.33%







Topside Solution:

KashaganFixed Platform









Subsea Solution:









Development Cost:

$29,000,000,000







Oil Gas Reserves:

750,000 mmboe















Kashagan, ENI[/b], - covers an area of 47 miles by 22 miles and is located in the North Caspian Sea approximately 50 miles offshore from Atyrau. The field is operated by ENI at 18.52 % and partnered by ExxonMobil(18.52%), Shell (18.52%), Total (18.52%)

























The Kashagan field development by operator ENI is located in Caspain Sea offshore Kazakhstan

in water depths of 3 meters

10 feet .





ENI with its partners started development of the Kashagan field in 2000.

The recoverable reserves are estimated to 750,000 mmboe . Number of subsea wells are 3. The production year is

2009 with a daily production estimate of 75,000 bopd. The Kashagan project is based on a

subsea solution with KashaganFixed Platform topside solution. The development cost is in the order of $29,000,000,000 with an estimated field life of years.



















Kashagan

Technical Information:





No of Wells:

3





Crude:







Water Depth:

3 meters

10 feet





Design Pressure:







Design Temperature:

20 Degree





Field Life:













Kashagan Project Status:



Daily Production: 75,000 bopd





Field Status:













Check back frequently for updated subsea oil and gas project info.







var txt = "Bookmark the Subsea Oil and Gas Directory";

var url = "index.htm"/*tpa=http://İnternet Adresi: www.subsea.org/*/;

var who = "Subsea Oil and Gas Directory - All Subsea Information";

var ver = navigator.appName;

var num = parseInt(navigator.appVersion);

if ((ver == "Microsoft Internet Explorer")


WEZ Format +3. Şuan Saat: 05:17 AM.

Powered by vBulletin® Version 3.8.8
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.