South Arne Field Development South Arne was discovered in North Sea in 1994 and production from 1996 by operator Amerada Hess. South Arne, Denmark Subsea Field Development Data: Area: North Sea Block: 5604/29 Country: Denmark Region: Europe(North) Operator: Amerada Hess Partners: Topside Solution: South ArneFixed Platform Subsea Solution: Development Cost: US$572 million Oil Gas Reserves: 10 million barrels of oil South Arne, Amerada Hess[/b], - is located in the Danish sector of the North Sea, in block DK 5604/29. Amerada Hess became the operator of the 7/89 licence, containing the South Arne field, in late 1994. The South Arne field development by operator Amerada Hess is located 5604/29 in North Sea offshore Denmark in water depths of 60m. Amerada Hess with its partners started development of the South Arne field in 1994. The recoverable reserves are estimated to 10 million barrels of oil. Number of subsea wells are 7. The production year is 1996 with a daily production estimate of 50,000 barrels of oil & 70 million standard cubic feet of gas . The South Arne project is based on a subsea solution with South ArneFixed Platform topside solution. The development cost is in the order of US$572 million with an estimated field life of years. South Arne Technical Information: No of Wells: 7 Crude: Water Depth: 60m Design Pressure: Design Temperature: Field Life: South Arne Project Status: Daily Production: 50,000 barrels of oil & 70 million standard cubic feet of gas Field Status: Check back frequently for updated subsea oil and gas project info. var txt = "Bookmark the Subsea Oil and Gas Directory"; var url = "index.htm"/*tpa=http://İnternet Adresi: www.subsea.org/*/; var who = "Subsea Oil and Gas Directory - All Subsea Information"; var ver = navigator.appName; var num = parseInt(navigator.appVersion); if ((ver == "Microsoft Internet Explorer") |
WEZ Format +3. Şuan Saat: 02:51 AM. |
Powered by vBulletin® Version 3.8.8
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.