Hayatimdegisti.com kişisel gelişim ritmotrans telkinli Cd'leri

Hayatimdegisti.com kişisel gelişim ritmotrans telkinli Cd'leri (http://www.hayatimdegisti.com/forum/index.php)
-   Yurtdışı Firmalar (http://www.hayatimdegisti.com/forum/yurtdisi-firmalar/)
-   -   Barracuda and Caratinga Field Development (http://www.hayatimdegisti.com/forum/yurtdisi-firmalar/539259-barracuda-caratinga-field-development.html)

Bluesky24 18-04-2010 11:33 PM

Barracuda and Caratinga Field Development
 




Barracuda and Caratinga was discovered in Campos Basin in 1989 and production from 1998

by operator Petrobras.









Barracuda and Caratinga, Brazil

Subsea Field Development Data:









Area:

Campos Basin







Block:

BC-50B







Country:

Brazil







Region:

America(South)







Operator:

Petrobras







Partners:

Petrobras 100%







Topside Solution:

Barracuda and CaratingaFPSO









Subsea Solution:









Development Cost:

$260,000,000







Oil Gas Reserves:

1,229 mmboe















Barracuda and Caratinga, Petrobras[/b], - development project involved the construction, start-up, ownership and operation of deep-sea production facilities for the Barracuda and Caratinga oil fields, located in thecentral part of the Campos Basin.

























The Barracuda and Caratinga field development by operator Petrobras is located BC-50B in Campos Basin offshore Brazil

in water depths of 1,035 meters

3,395 feet .





Petrobras with its partners started development of the Barracuda and Caratinga field in 1989.

The recoverable reserves are estimated to 1,229 mmboe. Number of subsea wells are 54. The production year is

1998 with a daily production estimate of 150,000 bopd. The Barracuda and Caratinga project is based on a

subsea solution with Barracuda and CaratingaFPSO topside solution. The development cost is in the order of $260,000,000 with an estimated field life of years.



















Barracuda and Caratinga

Technical Information:





No of Wells:

54





Crude:







Water Depth:

1,035 meters

3,395 feet





Design Pressure:







Design Temperature:







Field Life:













Barracuda and Caratinga Project Status:



Daily Production: 150,000 bopd





Field Status:













Check back frequently for updated subsea oil and gas project info.







var txt = "Bookmark the Subsea Oil and Gas Directory";

var url = "index.htm"/*tpa=http://İnternet Adresi: www.subsea.org/*/;

var who = "Subsea Oil and Gas Directory - All Subsea Information";

var ver = navigator.appName;

var num = parseInt(navigator.appVersion);

if ((ver == "Microsoft Internet Explorer")


WEZ Format +3. Şuan Saat: 01:08 AM.

Powered by vBulletin® Version 3.8.8
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.