Hayatimdegisti.com kişisel gelişim ritmotrans telkinli Cd'leri

Hayatimdegisti.com kişisel gelişim ritmotrans telkinli Cd'leri (http://www.hayatimdegisti.com/forum/index.php)
-   Yurtdışı Firmalar (http://www.hayatimdegisti.com/forum/yurtdisi-firmalar/)
-   -   Ursa Field Development (http://www.hayatimdegisti.com/forum/yurtdisi-firmalar/531527-ursa-field-development.html)

Bluesky24 17-04-2010 11:45 PM

Ursa Field Development
 




Ursa was discovered in Gulf of Mexico in 1991 and production from 1999

by operator Shell.









Ursa, USA

Subsea Field Development Data:









Area:

Gulf of Mexico







Block:

Mississippi Canyon Block 808-10, 852-54







Country:

USA







Region:

America(North)







Operator:

Shell







Partners:

Shell 45%,

BP Amoco 23%,

Conoco 16%







Topside Solution:

UrsaTension Leg Platform









Subsea Solution:









Development Cost:

$1,450,000,000







Oil Gas Reserves:

400 mmboe















Ursa, Shell[/b], - Shell Deepwater Production is the operator and holds a 45% interest in Ursa. BP Amoco has a 23% interest, and Conoco and Exxon each hold 16% in the project. The Ursa field is located approximately 130 miles southeast of New Orleans.

























The Ursa field development by operator Shell is located Mississippi Canyon Block 808-10, 852-54 in Gulf of Mexico offshore USA

in water depths of 1,218 meters

3,995 feet .





Shell with its partners started development of the Ursa field in 1991.

The recoverable reserves are estimated to 400 mmboe. Number of subsea wells are 14. The production year is

1999 with a daily production estimate of 150,000 bopd. The Ursa project is based on a

subsea solution with UrsaTension Leg Platform topside solution. The development cost is in the order of $1,450,000,000 with an estimated field life of years.



















Ursa

Technical Information:





No of Wells:

14





Crude:







Water Depth:

1,218 meters

3,995 feet





Design Pressure:







Design Temperature:







Field Life:













Ursa Project Status:



Daily Production: 150,000 bopd





Field Status:













Check back frequently for updated subsea oil and gas project info.







var txt = "Bookmark the Subsea Oil and Gas Directory";

var url = "index.htm"/*tpa=http://İnternet Adresi: www.subsea.org/*/;

var who = "Subsea Oil and Gas Directory - All Subsea Information";

var ver = navigator.appName;

var num = parseInt(navigator.appVersion);

if ((ver == "Microsoft Internet Explorer")


WEZ Format +3. Şuan Saat: 05:26 AM.

Powered by vBulletin® Version 3.8.8
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.