Hayatimdegisti.com kişisel gelişim ritmotrans telkinli Cd'leri

Hayatimdegisti.com kişisel gelişim ritmotrans telkinli Cd'leri (http://www.hayatimdegisti.com/forum/index.php)
-   Yurtdışı Firmalar (http://www.hayatimdegisti.com/forum/yurtdisi-firmalar/)
-   -   Bijupira and Salema Field Development (http://www.hayatimdegisti.com/forum/yurtdisi-firmalar/531278-bijupira-salema-field-development.html)

Bluesky24 17-04-2010 11:04 PM

Bijupira and Salema Field Development
 




Bijupira and Salema was discovered in Campos Basin in 1990 and production from 1993

by operator Enterprise Oil.









Bijupira and Salema, Brazil

Subsea Field Development Data:









Area:

Campos Basin







Block:









Country:

Brazil







Region:

America(South)







Operator:

Enterprise Oil







Partners:

Enterprise (55%) on behalf of Odebrecht (25%) and Petrobras (20%).







Topside Solution:

Bijupira and SalemaFPSO









Subsea Solution:









Development Cost:









Oil Gas Reserves:

170 million















Bijupira and Salema, Enterprise Oil[/b], - fields are located 250km east of Rio de Janeiro. The fields are operated by Enterprise (55%) on behalf of Odebrecht (25%) and Petrobras (20%). They range in water depths between 1,575ft and 2,900ft.

























The Bijupira and Salema field development by operator Enterprise Oil is located in Campos Basin offshore Brazil

in water depths of 1,575ft and 2,900ft.





Enterprise Oil with its partners started development of the Bijupira and Salema field in 1990.

The recoverable reserves are estimated to 170 million . Number of subsea wells are 3. The production year is

1993 with a daily production estimate of 70,000 barrels . The Bijupira and Salema project is based on a

subsea solution with Bijupira and SalemaFPSO topside solution. The development cost is in the order of with an estimated field life of years.



















Bijupira and Salema

Technical Information:





No of Wells:

3





Crude:

28° API and 31° API





Water Depth:

1,575ft and 2,900ft





Design Pressure:







Design Temperature:







Field Life:













Bijupira and Salema Project Status:



Daily Production: 70,000 barrels





Field Status:













Check back frequently for updated subsea oil and gas project info.







var txt = "Bookmark the Subsea Oil and Gas Directory";

var url = "index.htm"/*tpa=http://İnternet Adresi: www.subsea.org/*/;

var who = "Subsea Oil and Gas Directory - All Subsea Information";

var ver = navigator.appName;

var num = parseInt(navigator.appVersion);

if ((ver == "Microsoft Internet Explorer")


WEZ Format +3. Şuan Saat: 09:57 AM.

Powered by vBulletin® Version 3.8.8
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.