![]() |
Rivers Field Development Rivers was discovered in Irish Sea in 2001 and production from 2002 by operator Burlington Resources. Rivers, UK Subsea Field Development Data: Area: Irish Sea Block: 110/2b, 110/la, 110/lc, 110/Sa, 110/9a and 110/14 Country: UK Region: Europe(North) Operator: Burlington Resources Partners: Topside Solution: RiversSubsea Tieback Subsea Solution: Development Cost: £400 million Oil Gas Reserves: 300 billion cubic feet Rivers, Burlington Resources[/b], - Burlington Resources received formal approval for its £165 million Rivers Fields development. These consist of five gas fields -Calder, Darwen, Crossans, Hodder and Asland. The Rivers field development by operator Burlington Resources is located 110/2b, 110/la, 110/lc, 110/Sa, 110/9a and 110/14 in Irish Sea offshore UK in water depths of . Burlington Resources with its partners started development of the Rivers field in 2001. The recoverable reserves are estimated to 300 billion cubic feet. Number of subsea wells are 4. The production year is 2002 with a daily production estimate of 100 million cubic feet per day. The Rivers project is based on a subsea solution with RiversSubsea Tieback topside solution. The development cost is in the order of £400 million with an estimated field life of years. Rivers Technical Information: No of Wells: 4 Crude: Water Depth: Design Pressure: Design Temperature: Field Life: Rivers Project Status: Daily Production: 100 million cubic feet per day Field Status: Check back frequently for updated subsea oil and gas project info. var txt = "Bookmark the Subsea Oil and Gas Directory"; var url = "index.htm"/*tpa=http://İnternet Adresi: www.subsea.org/*/; var who = "Subsea Oil and Gas Directory - All Subsea Information"; var ver = navigator.appName; var num = parseInt(navigator.appVersion); if ((ver == "Microsoft Internet Explorer") |
| WEZ Format +3. Şuan Saat: 01:58 PM. |
Powered by vBulletin® Version 3.8.8
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.