![]() |
Canyon Express Field Development Canyon Express was discovered in Gulf of Mexico in 1999 and production from 2002 by operator Total. Canyon Express, USA Subsea Field Development Data: Area: Gulf of Mexico Block: MC blocks 348, 305, 217, 173 and DC 177 and 133 Country: USA Region: America(North) Operator: Total Partners: BP 35%, TotalFinaElf 25.83%, Pioneer Natural Resources 23.545%, Mariner Energy 5.625%, and Marathon 10.0% Topside Solution: Canyon ExpressSubsea Tieback Subsea Solution: Development Cost: $600,000,000 Oil Gas Reserves: Canyon Express, Total[/b], - entails the development of three gas fields in the deep Mississippi Canyon, approximately 120 miles south-east of New Orleans. The Canyon Express field development by operator Total is located MC blocks 348, 305, 217, 173 and DC 177 and 133 in Gulf of Mexico offshore USA in water depths of 2,200 meters 7,216 feet. Total with its partners started development of the Canyon Express field in 1999. The recoverable reserves are estimated to . Number of subsea wells are . The production year is 2002 with a daily production estimate of . The Canyon Express project is based on a subsea solution with Canyon ExpressSubsea Tieback topside solution. The development cost is in the order of $600,000,000 with an estimated field life of years. Canyon Express Technical Information: No of Wells: Crude: Water Depth: 2,200 meters 7,216 feet Design Pressure: Design Temperature: Field Life: Canyon Express Project Status: Daily Production: Field Status: Check back frequently for updated subsea oil and gas project info. var txt = "Bookmark the Subsea Oil and Gas Directory"; var url = "index.htm"/*tpa=http://İnternet Adresi: www.subsea.org/*/; var who = "Subsea Oil and Gas Directory - All Subsea Information"; var ver = navigator.appName; var num = parseInt(navigator.appVersion); if ((ver == "Microsoft Internet Explorer") |
WEZ Format +3. Şuan Saat: 06:52 AM. |
Powered by vBulletin® Version 3.8.8
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.