![]() |
Duart Field Development Duart was discovered in North Sea in and production from 2007 by operator Talisman. Duart, UK Subsea Field Development Data: Area: North Sea Block: 14/20b Country: UK Region: Europe(North) Operator: Talisman Partners: Talisman 50% and Nexen 50% Topside Solution: DuartSubsea Tieback Subsea Solution: Single Well Development Cost: Oil Gas Reserves: 6 million bbl Duart, Talisman[/b], - an eight-inch production line and a three-inch gas lift line to be installed to flow the field back to Tartan The Duart field development by operator Talisman is located 14/20b in North Sea offshore UK in water depths of 140 m. Talisman with its partners started development of the Duart field in . The recoverable reserves are estimated to 6 million bbl. Number of subsea wells are 1. The production year is 2007 with a daily production estimate of 6,000 bbl. The Duart project is based on a Single Well subsea solution with DuartSubsea Tieback topside solution. The development cost is in the order of with an estimated field life of years. Duart Technical Information: No of Wells: 1 Crude: Crude Water Depth: 140 m Design Pressure: Design Temperature: Field Life: Duart Project Status: Daily Production: 6,000 bbl Field Status: Under Development Check back frequently for updated subsea oil and gas project info. var txt = "Bookmark the Subsea Oil and Gas Directory"; var url = "index.htm"/*tpa=http://İnternet Adresi: www.subsea.org/*/; var who = "Subsea Oil and Gas Directory - All Subsea Information"; var ver = navigator.appName; var num = parseInt(navigator.appVersion); if ((ver == "Microsoft Internet Explorer") |
WEZ Format +3. Şuan Saat: 09:31 PM. |
Powered by vBulletin® Version 3.8.8
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.