![]() |
Oseberg Transport System (OTS) Pipeline - Crude Oil Pipeline System in North Sea Oseberg Transport System (OTS) pipeline system, operated by Norsk Hydro, runs from Oseberg, Veslefrikk, Brage, Frøy and Lille-Frigg is piped to Sture near Bergen with a length of 115 km in the North Sea offshore Norway. Oseberg Transport System (OTS), North Sea Subsea Crude Oil Pipeline Development Data: Area: North Sea Region: Europe(North) Route: from Oseberg, Veslefrikk, Brage, Frøy and Lille-Frigg is piped to Sture near Bergen Start Country: Norway End Country: Norway Operator: Norsk Hydro Partners: Statoil, Hydro (operator), TotalFinaElf and ExxonMobil Time of Start-Up: 1988 Development Cost: Unknown Oseberg Transport System (OTS) Norsk Hydro pipelines, Norsk Hydro[/b] - This was the first pipeline to bring oil ashore in Norway when it began operating in 1988. Crude from Oseberg, Veslefrikk, Brage, Frøy and Lille-Frigg is piped for 115 kilometres through the 28-inch line to Sture near Bergen. Oseberg Transport System (OTS) Pipeline Technical Specification: Medium: Crude Oil Capacity: 765,000 barrels per day Pressure: Size: 28 inches in diameter Pipe Construction: Pipelay Vessel(s): Oseberg Transport System (OTS)Crude Oil Pipeline Project: Pipeline Status: In Operation Check back frequently for updated subsea oil and gas pipeline info. var txt = "Bookmark the Subsea Oil and Gas Directory"; var url = "index.htm"/*tpa=http://İnternet Adresi: www.subsea.org/*/; var who = "Subsea Oil and Gas Directory - All Subsea Information"; var ver = navigator.appName; var num = parseInt(navigator.appVersion); if ((ver == "Microsoft Internet Explorer") |
| WEZ Format +3. Şuan Saat: 04:17 PM. |
Powered by vBulletin® Version 3.8.8
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.