![]() |
Girassol Field Development Girassol was discovered in West of Africa in 1998 and production from 2001 by operator Total. Girassol, Angola Subsea Field Development Data: Area: West of Africa Block: 17 Country: Angola Region: Africa Operator: Total Partners: Totalfinaelf 35%, Exxon 20%, Bp Amoco16.7%, Statoil 13.3%, Norsk Hydro 10%, Totoal Fina 5% Topside Solution: GirassolFPSO Subsea Solution: Cluster manifolds Development Cost: $2,800,000,000 Oil Gas Reserves: 700,000 mmboe Girassol, Total[/b], - the Girassol is located 150 km off the west coast of Angola in aproximately 1,400 m of water. The field was one of the first large deepwater projects in Africa. The Girassol field development by operator Total is located 17 in West of Africa offshore Angola in water depths of 1350 m. Total with its partners started development of the Girassol field in 1998. The recoverable reserves are estimated to 700,000 mmboe. Number of subsea wells are 40. The production year is 2001 with a daily production estimate of 200,000 bopd. The Girassol project is based on a Cluster manifolds subsea solution with GirassolFPSO topside solution. The development cost is in the order of $2,800,000,000 with an estimated field life of 25 years. Girassol Technical Information: No of Wells: 40 Crude: 32 API crude Water Depth: 1350 m Design Pressure: 420 bar Design Temperature: 60 degree Field Life: 25 Girassol Project Status: Daily Production: 200,000 bopd Field Status: Onstream. Check back frequently for updated subsea oil and gas project info. var txt = "Bookmark the Subsea Oil and Gas Directory"; var url = "index.htm"/*tpa=http://İnternet Adresi: www.subsea.org/*/; var who = "Subsea Oil and Gas Directory - All Subsea Information"; var ver = navigator.appName; var num = parseInt(navigator.appVersion); if ((ver == "Microsoft Internet Explorer") |
WEZ Format +3. Şuan Saat: 02:05 PM. |
Powered by vBulletin® Version 3.8.8
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.