![]() |
Vesterled Pipeline - Gas Pipeline System in North Sea Vesterled pipeline system, operated by Gassco, runs from the Heimdal Riser platform in the North Sea to St Fergus in the UK with a length of 361 km in the North Sea offshore Norway. Vesterled, North Sea Subsea Gas Pipeline Development Data: Area: North Sea Region: Europe(North) Route: from the Heimdal Riser platform in the North Sea to St Fergus in the UK Start Country: Norway End Country: UK Operator: Gassco Partners: Total E&P UK, Gassco Time of Start-Up: 1978 Development Cost: Vesterled Gassco pipelines, Gassco[/b] - The Vesterled system runs from the Heimdal Riser platform in the North Sea to St Fergus in the UK, is 361 kilometres long overall and has an internal diameter of 32 inches. Vesterled Pipeline Technical Specification: Medium: Gas Capacity: 36 scm/d Pressure: Size: 32 inches in diameter Pipe Construction: Pipelay Vessel(s): VesterledGas Pipeline Project: Pipeline Status: In Operation Check back frequently for updated subsea oil and gas pipeline info. var txt = "Bookmark the Subsea Oil and Gas Directory"; var url = "index.htm"/*tpa=http://İnternet Adresi: www.subsea.org/*/; var who = "Subsea Oil and Gas Directory - All Subsea Information"; var ver = navigator.appName; var num = parseInt(navigator.appVersion); if ((ver == "Microsoft Internet Explorer") |
WEZ Format +3. Şuan Saat: 04:59 AM. |
Powered by vBulletin® Version 3.8.8
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.