Hayatimdegisti.com kişisel gelişim ritmotrans telkinli Cd'leri

Hayatimdegisti.com kişisel gelişim ritmotrans telkinli Cd'leri (http://www.hayatimdegisti.com/forum/index.php)
-   Yurtdışı Firmalar (http://www.hayatimdegisti.com/forum/yurtdisi-firmalar/)
-   -   Corrib Gas Field Development (http://www.hayatimdegisti.com/forum/yurtdisi-firmalar/521230-corrib-gas-field-development.html)

Bluesky24 16-04-2010 02:43 AM

Corrib Gas Field Development
 




Corrib Gas was discovered in North Atlantic in 1996 and production from 1973

by operator Shell.









Corrib Gas, Ireland

Subsea Field Development Data:









Area:

North Atlantic







Block:

18/20 and 18/25







Country:

Ireland







Region:

Europe(North)







Operator:

Shell







Partners:

Shell E&P Ireland (operator) - 45% ,Statoil Exploration (Ireland) Limited - 36.5% ,Marathon International Petroleum Hibernia Limited - 18.5%.







Topside Solution:

Corrib GasSubsea Tieback









Subsea Solution:

Cluster manifold







Development Cost:

£500 million







Oil Gas Reserves:

1 trillion ft³















Corrib Gas, Shell[/b], - field is a Triassic gas development in the Atlantic Ocean, situated off the coast of Ireland. It is approximately 50 miles west of the Mullet peninsula in County Mayo and lies in the Slyne Trough in Blocks 18/20 and 18/25.

























The Corrib Gas field development by operator Shell is located 18/20 and 18/25 in North Atlantic offshore Ireland

in water depths of 355m .





Shell with its partners started development of the Corrib Gas field in 1996.

The recoverable reserves are estimated to 1 trillion ft³. Number of subsea wells are 8. The production year is

1973 with a daily production estimate of . The Corrib Gas project is based on a Cluster manifold

subsea solution with Corrib GasSubsea Tieback topside solution. The development cost is in the order of £500 million with an estimated field life of 15-20 years.



















Corrib Gas

Technical Information:





No of Wells:

8





Crude:







Water Depth:

355m





Design Pressure:







Design Temperature:







Field Life:

15-20











Corrib Gas Project Status:



Daily Production:





Field Status:













Check back frequently for updated subsea oil and gas project info.







var txt = "Bookmark the Subsea Oil and Gas Directory";

var url = "index.htm"/*tpa=http://İnternet Adresi: www.subsea.org/*/;

var who = "Subsea Oil and Gas Directory - All Subsea Information";

var ver = navigator.appName;

var num = parseInt(navigator.appVersion);

if ((ver == "Microsoft Internet Explorer")


WEZ Format +3. Şuan Saat: 11:11 AM.

Powered by vBulletin® Version 3.8.8
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.