![]() |
Sleipner Condensate Pipeline - Condensate Pipeline System in North Sea Sleipner Condensate pipeline system, operated by Statoil, runs from the Sleipner fields to Kårstø north of Stavanger with a length of 245 km in the North Sea offshore Norway. Sleipner Condensate, North Sea Subsea Condensate Pipeline Development Data: Area: North Sea Region: Europe(North) Route: from the Sleipner fields to Kårstø north of Stavanger Start Country: Norway End Country: Norway Operator: Statoil Partners: Statoil (operator), ExxonMobil, Hydro and TotalFinaElf. Time of Start-Up: 1993 Development Cost: Unknown Sleipner Condensate Statoil pipelines, Statoil[/b] - Condensate from the Sleipner fields is piped for 245 kilometres through a 20-inch line to Kårstø north of Stavanger for processing. Began operating in 1993. Sleipner Condensate Pipeline Technical Specification: Medium: Condensate Capacity: 200,000 barrels per day Pressure: Size: 20 inch in diameter Pipe Construction: Pipelay Vessel(s): Sleipner CondensateCondensate Pipeline Project: Pipeline Status: In Operation Check back frequently for updated subsea oil and gas pipeline info. var txt = "Bookmark the Subsea Oil and Gas Directory"; var url = "index.htm"/*tpa=http://İnternet Adresi: www.subsea.org/*/; var who = "Subsea Oil and Gas Directory - All Subsea Information"; var ver = navigator.appName; var num = parseInt(navigator.appVersion); if ((ver == "Microsoft Internet Explorer") |
| WEZ Format +3. Şuan Saat: 03:56 PM. |
Powered by vBulletin® Version 3.8.8
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.