![]() |
Zeepipe Pipeline - Gas Pipeline System in North Sea Zeepipe pipeline system, operated by Gassco, runs from the Sleipner area of the North Sea to a receiving terminal at Zeebrugge in Belgium with a length of 814 km in the North Sea offshore Norway. Zeepipe, North Sea Subsea Gas Pipeline Development Data: Area: North Sea Region: Europe(North) Route: from the Sleipner area of the North Sea to a receiving terminal at Zeebrugge in Belgium Start Country: Norway End Country: Netherlands Operator: Gassco Partners: Statoil, Gassco Time of Start-Up: 1997 Development Cost: Zeepipe Gassco pipelines, Gassco[/b] - From the Troll Gas processing plant at Kollsnes near Bergen to the Sleipner area, a pipeline with an internal diameter of 40 inches, running for 814 kilometres from the Sleipner area of the North Sea to a receiving terminal at Zeebrugge in Belgium. Zeepipe Pipeline Technical Specification: Medium: Gas Capacity: 42 scm/d Pressure: Size: 40 inches in diameter Pipe Construction: Pipelay Vessel(s): ZeepipeGas Pipeline Project: Pipeline Status: In Operation Check back frequently for updated subsea oil and gas pipeline info. var txt = "Bookmark the Subsea Oil and Gas Directory"; var url = "index.htm"/*tpa=http://İnternet Adresi: www.subsea.org/*/; var who = "Subsea Oil and Gas Directory - All Subsea Information"; var ver = navigator.appName; var num = parseInt(navigator.appVersion); if ((ver == "Microsoft Internet Explorer") |
WEZ Format +3. Şuan Saat: 10:30 PM. |
Powered by vBulletin® Version 3.8.8
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.