![]() |
Glitne Field Development Glitne was discovered in North Sea in 1955 and production from 2001 by operator StatoilHydro. Glitne, Norway Subsea Field Development Data: Area: North Sea Block: Norwegian North Sea 15/5 Country: Norway Region: Europe(North) Operator: StatoilHydro Partners: Statoil 38.9%, SDFI 30%, Elf 21.8%, Norsk Hydro 9.3% Topside Solution: GlitneFPSO Subsea Solution: Development Cost: $90,000,000 Oil Gas Reserves: 25 mmboe Glitne, StatoilHydro[/b], - lies in blocks 15/5 and 15/6 in the Sleipner area of the Norwegian North Sea, about 40 kilometres north-west of Statoil's Sleipner East development. The water depth in the area is approximately 110 metres. The Glitne field development by operator StatoilHydro is located Norwegian North Sea 15/5 in North Sea offshore Norway in water depths of 110 meters 361 feet . StatoilHydro with its partners started development of the Glitne field in 1955. The recoverable reserves are estimated to 25 mmboe. Number of subsea wells are 6. The production year is 2001 with a daily production estimate of 40,000 bopd. The Glitne project is based on a subsea solution with GlitneFPSO topside solution. The development cost is in the order of $90,000,000 with an estimated field life of years. Glitne Technical Information: No of Wells: 6 Crude: 46,000 bopd Water Depth: 110 meters 361 feet Design Pressure: Design Temperature: Field Life: Glitne Project Status: Daily Production: 40,000 bopd Field Status: Check back frequently for updated subsea oil and gas project info. var txt = "Bookmark the Subsea Oil and Gas Directory"; var url = "index.htm"/*tpa=http://İnternet Adresi: www.subsea.org/*/; var who = "Subsea Oil and Gas Directory - All Subsea Information"; var ver = navigator.appName; var num = parseInt(navigator.appVersion); if ((ver == "Microsoft Internet Explorer") |
WEZ Format +3. Şuan Saat: 09:40 PM. |
Powered by vBulletin® Version 3.8.8
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.