Hayatimdegisti.com kişisel gelişim ritmotrans telkinli Cd'leri

Hayatimdegisti.com kişisel gelişim ritmotrans telkinli Cd'leri (http://www.hayatimdegisti.com/forum/index.php)
-   Yurtdışı Firmalar (http://www.hayatimdegisti.com/forum/yurtdisi-firmalar/)
-   -   Mardi Gras Oil and Gas Transportation System Field Development (http://www.hayatimdegisti.com/forum/yurtdisi-firmalar/509385-mardi-gras-oil-gas-transportation-system-field-development.html)

Bluesky24 14-04-2010 02:01 PM

Mardi Gras Oil and Gas Transportation System Field Development
 




Mardi Gras Oil and Gas Transportation System was discovered in Gulf of Mexico in and production from

by operator BP.









Mardi Gras Oil and Gas Transportation System, USA

Subsea Field Development Data:









Area:

Gulf of Mexico







Block:









Country:

USA







Region:

America(North)







Operator:

BP







Partners:









Topside Solution:

Mardi Gras Oil and Gas Transportation SystemSubsea Tieback









Subsea Solution:









Development Cost:









Oil Gas Reserves:

















Mardi Gras Oil and Gas Transportation System, BP[/b], - fields lies in the Mississippi Canyon and Green Canyon areas of the Gulf of Mexico. In the southern Green Canyon area, pipelines are planned to transport gas and oil from the Mad Dog, Holstein and Atlantis fields.

























The Mardi Gras Oil and Gas Transportation System field development by operator BP is located in Gulf of Mexico offshore USA

in water depths of 1,200m to 1,950m.





BP with its partners started development of the Mardi Gras Oil and Gas Transportation System field in .

The recoverable reserves are estimated to . Number of subsea wells are . The production year is

with a daily production estimate of 1 million b/d. The Mardi Gras Oil and Gas Transportation System project is based on a

subsea solution with Mardi Gras Oil and Gas Transportation SystemSubsea Tieback topside solution. The development cost is in the order of with an estimated field life of years.



















Mardi Gras Oil and Gas Transportation System

Technical Information:





No of Wells:







Crude:







Water Depth:

1,200m to 1,950m





Design Pressure:







Design Temperature:







Field Life:













Mardi Gras Oil and Gas Transportation System Project Status:



Daily Production: 1 million b/d





Field Status:













Check back frequently for updated subsea oil and gas project info.







var txt = "Bookmark the Subsea Oil and Gas Directory";

var url = "index.htm"/*tpa=http://İnternet Adresi: www.subsea.org/*/;

var who = "Subsea Oil and Gas Directory - All Subsea Information";

var ver = navigator.appName;

var num = parseInt(navigator.appVersion);

if ((ver == "Microsoft Internet Explorer")


WEZ Format +3. Şuan Saat: 08:37 PM.

Powered by vBulletin® Version 3.8.8
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.