Valhall Flank Water Injection Platform was discovered in North Sea in 1969 and production from 1981

by operator BP.









Valhall Flank Water Injection Platform, Norway

Subsea Field Development Data:









Area:

North Sea







Block:

Block 2/8 (PL006) & Block 2/11 (PL033)







Country:

Norway







Region:

Europe(North)







Operator:

BP







Partners:

BP (28.09%) on behalf of Amerada Hess (28.09%), Enterprise (28.09%) and TotalFinaElf (15.72%).







Topside Solution:

Valhall Flank Water Injection PlatformWellhead Platform









Subsea Solution:









Development Cost:

NOK 4.5 billion







Oil Gas Reserves:

















Valhall Flank Water Injection Platform, BP[/b], - field was discovered in 1969 and came onstream in 1982. It is operated by BP (28.09%) on behalf of Amerada Hess (28.09%), Enterprise (28.09%) and TotalFinaElf (15.72%).

























The Valhall Flank Water Injection Platform field development by operator BP is located Block 2/8 (PL006) & Block 2/11 (PL033) in North Sea offshore Norway

in water depths of .





BP with its partners started development of the Valhall Flank Water Injection Platform field in 1969.

The recoverable reserves are estimated to . Number of subsea wells are 8. The production year is

1981 with a daily production estimate of 168,000 barrels of oil and 350 million cubic feet of gas per day. . The Valhall Flank Water Injection Platform project is based on a

subsea solution with Valhall Flank Water Injection PlatformWellhead Platform topside solution. The development cost is in the order of NOK 4.5 billion with an estimated field life of 30 years.



















Valhall Flank Water Injection Platform

Technical Information:





No of Wells:

8





Crude:







Water Depth:







Design Pressure:







Design Temperature:







Field Life:

30











Valhall Flank Water Injection Platform Project Status:



Daily Production: 168,000 barrels of oil and 350 million cubic feet of gas per day.





Field Status: Onstream













Check back frequently for updated subsea oil and gas project info.







var txt = "Bookmark the Subsea Oil and Gas Directory";

var url = "index.htm"/*tpa=http://İnternet Adresi: www.subsea.org/*/;

var who = "Subsea Oil and Gas Directory - All Subsea Information";

var ver = navigator.appName;

var num = parseInt(navigator.appVersion);

if ((ver == "Microsoft Internet Explorer")
 

Hayatını Değiştiren Asıl Şey Ne?

Aynı döngüler, tekrar eden sorunlar, açıklayamadığın tıkanıklıklar… Çoğu zaman sebep çekirdek inançlarındadır.

Çocuklukta oluşan bu görünmez kalıplar; para, ilişki, özgüven ve başarı alanlarını fark ettirmeden yönetir.

Çekirdek İnanç Analizini Gör İlk adım fark etmekle başlar.
Sitemiz bir forum sitesi olduğu için kullanıcılar her türlü görüşlerini önceden onay olmadan anında siteye yazabilmektedir. 5651 sayılı yasaya göre bu yazılardan dolayı doğabilecek her türlü sorumluluk yazan kullanıcılara aittir. 5651 sayılı yasaya göre sitemiz mesajları kontrolle yükümlü olmayıp, yasaya aykırı yada telif hakkı içeren paylaşımlar BURADAN bize ulaşıldığı taktirde, ilgili konu en geç 48 saat içerisinde kaldırılacaktır. Sitemizde Bulunan Videolar YouTube, Facebook, Dailymotion, v.b. video paylaşım sitelerinden alınmaktadır. Telif hakları sorumluluğu bu sitelere aittir. Videoların hiç biri sunucularımızda bulunmamaktadır.
Geri
Üst