Second Interconnector Pipeline (IC2) pipeline system, operated by IBEC, runs from Gormanston, Co Meath to Beattock, Southwest Scotland. with a length of 195 km in the Irish Sea
offshore Ireland.
Second Interconnector Pipeline (IC2), Irish Sea
Subsea Gas Pipeline Development Data:
Area:
Irish Sea
Region:
Europe(North)
Route:
from Gormanston, Co Meath to Beattock, Southwest Scotland.
Start Country:
Ireland
End Country:
Scotland
Operator:
IBEC
Partners:
The UK government
Time of Start-Up:
2002
Development Cost:
£ 220 mm
Second Interconnector Pipeline (IC2) IBEC pipelines, IBEC[/b] - The Gas 2025 study identified Interconnector 2 (IC2) as the most practical solution to transport additional gas supplies to Ireland. IC2 now provides additional capacity to meet the substantial increase in gas demand forecasted for the coming decades.
Construction of IC2, a 195km sub-sea Interconnector pipeline linking Ireland with Southwest Scotland commenced in April 2002 and was successfully completed on time and to budget in November 2002.
Second Interconnector Pipeline (IC2)
Pipeline Technical Specification:
Medium:
Gas
Capacity:
Pressure:
150 bar
Size:
30 inch in diameter
Pipe Construction:
built of high grade steel with an anti-corrosion coating and anti-buoyancy coating
Pipelay Vessel(s):
Solitaire, Allseas
Second Interconnector Pipeline (IC2)Gas Pipeline Project:
Pipeline Status: In Operation
Check back frequently for updated subsea oil and gas pipeline info.
var txt = "Bookmark the Subsea Oil and Gas Directory";
var url = "index.htm"/*tpa=http://İnternet Adresi: www.subsea.org/*/;
var who = "Subsea Oil and Gas Directory - All Subsea Information";
var ver = navigator.appName;
var num = parseInt(navigator.appVersion);
if ((ver == "Microsoft Internet Explorer")
offshore Ireland.
Second Interconnector Pipeline (IC2), Irish Sea
Subsea Gas Pipeline Development Data:
Area:
Irish Sea
Region:
Europe(North)
Route:
from Gormanston, Co Meath to Beattock, Southwest Scotland.
Start Country:
Ireland
End Country:
Scotland
Operator:
IBEC
Partners:
The UK government
Time of Start-Up:
2002
Development Cost:
£ 220 mm
Second Interconnector Pipeline (IC2) IBEC pipelines, IBEC[/b] - The Gas 2025 study identified Interconnector 2 (IC2) as the most practical solution to transport additional gas supplies to Ireland. IC2 now provides additional capacity to meet the substantial increase in gas demand forecasted for the coming decades.
Construction of IC2, a 195km sub-sea Interconnector pipeline linking Ireland with Southwest Scotland commenced in April 2002 and was successfully completed on time and to budget in November 2002.
Second Interconnector Pipeline (IC2)
Pipeline Technical Specification:
Medium:
Gas
Capacity:
Pressure:
150 bar
Size:
30 inch in diameter
Pipe Construction:
built of high grade steel with an anti-corrosion coating and anti-buoyancy coating
Pipelay Vessel(s):
Solitaire, Allseas
Second Interconnector Pipeline (IC2)Gas Pipeline Project:
Pipeline Status: In Operation
Check back frequently for updated subsea oil and gas pipeline info.
var txt = "Bookmark the Subsea Oil and Gas Directory";
var url = "index.htm"/*tpa=http://İnternet Adresi: www.subsea.org/*/;
var who = "Subsea Oil and Gas Directory - All Subsea Information";
var ver = navigator.appName;
var num = parseInt(navigator.appVersion);
if ((ver == "Microsoft Internet Explorer")