- Katılım
- 16 Aralık 2008
- Mesajlar
- 145,988
- Reaksiyon puanı
- 1
- Puanları
- 0
Oseberg Transport System (OTS) pipeline system, operated by Norsk Hydro, runs from Oseberg, Veslefrikk, Brage, Frøy and Lille-Frigg is piped to Sture near Bergen with a length of 115 km in the North Sea
offshore Norway.
Oseberg Transport System (OTS), North Sea
Subsea Crude Oil Pipeline Development Data:
Area:
North Sea
Region:
Europe(North)
Route:
from Oseberg, Veslefrikk, Brage, Frøy and Lille-Frigg is piped to Sture near Bergen
Start Country:
Norway
End Country:
Norway
Operator:
Norsk Hydro
Partners:
Statoil, Hydro (operator), TotalFinaElf and ExxonMobil
Time of Start-Up:
1988
Development Cost:
Unknown
Oseberg Transport System (OTS) Norsk Hydro pipelines, Norsk Hydro[/b] - This was the first pipeline to bring oil ashore in Norway when it began operating in 1988. Crude from Oseberg, Veslefrikk, Brage, Frøy and Lille-Frigg is piped for 115 kilometres through the 28-inch line to Sture near Bergen.
Oseberg Transport System (OTS)
Pipeline Technical Specification:
Medium:
Crude Oil
Capacity:
765,000 barrels per day
Pressure:
Size:
28 inches in diameter
Pipe Construction:
Pipelay Vessel(s):
Oseberg Transport System (OTS)Crude Oil Pipeline Project:
Pipeline Status: In Operation
Check back frequently for updated subsea oil and gas pipeline info.
var txt = "Bookmark the Subsea Oil and Gas Directory";
var url = "index.htm"/*tpa=http://İnternet Adresi: www.subsea.org/*/;
var who = "Subsea Oil and Gas Directory - All Subsea Information";
var ver = navigator.appName;
var num = parseInt(navigator.appVersion);
if ((ver == "Microsoft Internet Explorer")
offshore Norway.
Oseberg Transport System (OTS), North Sea
Subsea Crude Oil Pipeline Development Data:
Area:
North Sea
Region:
Europe(North)
Route:
from Oseberg, Veslefrikk, Brage, Frøy and Lille-Frigg is piped to Sture near Bergen
Start Country:
Norway
End Country:
Norway
Operator:
Norsk Hydro
Partners:
Statoil, Hydro (operator), TotalFinaElf and ExxonMobil
Time of Start-Up:
1988
Development Cost:
Unknown
Oseberg Transport System (OTS) Norsk Hydro pipelines, Norsk Hydro[/b] - This was the first pipeline to bring oil ashore in Norway when it began operating in 1988. Crude from Oseberg, Veslefrikk, Brage, Frøy and Lille-Frigg is piped for 115 kilometres through the 28-inch line to Sture near Bergen.
Oseberg Transport System (OTS)
Pipeline Technical Specification:
Medium:
Crude Oil
Capacity:
765,000 barrels per day
Pressure:
Size:
28 inches in diameter
Pipe Construction:
Pipelay Vessel(s):
Oseberg Transport System (OTS)Crude Oil Pipeline Project:
Pipeline Status: In Operation
Check back frequently for updated subsea oil and gas pipeline info.
var txt = "Bookmark the Subsea Oil and Gas Directory";
var url = "index.htm"/*tpa=http://İnternet Adresi: www.subsea.org/*/;
var who = "Subsea Oil and Gas Directory - All Subsea Information";
var ver = navigator.appName;
var num = parseInt(navigator.appVersion);
if ((ver == "Microsoft Internet Explorer")
