- Katılım
- 16 Aralık 2008
- Mesajlar
- 145,988
- Reaksiyon puanı
- 1
- Puanları
- 0
Dunbar Phase II was discovered in North Sea in 1999 and production from
by operator Total Oil Marine.
Dunbar Phase II, UK
Subsea Field Development Data:
Area:
North Sea
Block:
3/8a, 3/8b, 3/14a, 3/14b, 3/14d and 3/15
Country:
UK
Region:
Europe(North)
Operator:
Total Oil Marine
Partners:
Topside Solution:
Dunbar Phase IIJacket
Subsea Solution:
Development Cost:
Oil Gas Reserves:
1.2 billion boe
Dunbar Phase II, Total Oil Marine[/b], - In late 1999, a Poseidon multiphase pump was installed on the Dunbar field, as the final part of Dunbar Phase 2. This will increase recoverability and extend field life.
The Dunbar Phase II field development by operator Total Oil Marine is located 3/8a, 3/8b, 3/14a, 3/14b, 3/14d and 3/15 in North Sea offshore UK
in water depths of .
Total Oil Marine with its partners started development of the Dunbar Phase II field in 1999.
The recoverable reserves are estimated to 1.2 billion boe. Number of subsea wells are 16. The production year is
with a daily production estimate of . The Dunbar Phase II project is based on a
subsea solution with Dunbar Phase IIJacket topside solution. The development cost is in the order of with an estimated field life of years.
Dunbar Phase II
Technical Information:
No of Wells:
16
Crude:
Water Depth:
Design Pressure:
138.7 barg
Design Temperature:
110
Field Life:
Dunbar Phase II Project Status:
Daily Production:
Field Status:
Check back frequently for updated subsea oil and gas project info.
var txt = "Bookmark the Subsea Oil and Gas Directory";
var url = "index.htm"/*tpa=http://İnternet Adresi: www.subsea.org/*/;
var who = "Subsea Oil and Gas Directory - All Subsea Information";
var ver = navigator.appName;
var num = parseInt(navigator.appVersion);
if ((ver == "Microsoft Internet Explorer")
by operator Total Oil Marine.
Dunbar Phase II, UK
Subsea Field Development Data:
Area:
North Sea
Block:
3/8a, 3/8b, 3/14a, 3/14b, 3/14d and 3/15
Country:
UK
Region:
Europe(North)
Operator:
Total Oil Marine
Partners:
Topside Solution:
Dunbar Phase IIJacket
Subsea Solution:
Development Cost:
Oil Gas Reserves:
1.2 billion boe
Dunbar Phase II, Total Oil Marine[/b], - In late 1999, a Poseidon multiphase pump was installed on the Dunbar field, as the final part of Dunbar Phase 2. This will increase recoverability and extend field life.
The Dunbar Phase II field development by operator Total Oil Marine is located 3/8a, 3/8b, 3/14a, 3/14b, 3/14d and 3/15 in North Sea offshore UK
in water depths of .
Total Oil Marine with its partners started development of the Dunbar Phase II field in 1999.
The recoverable reserves are estimated to 1.2 billion boe. Number of subsea wells are 16. The production year is
with a daily production estimate of . The Dunbar Phase II project is based on a
subsea solution with Dunbar Phase IIJacket topside solution. The development cost is in the order of with an estimated field life of years.
Dunbar Phase II
Technical Information:
No of Wells:
16
Crude:
Water Depth:
Design Pressure:
138.7 barg
Design Temperature:
110
Field Life:
Dunbar Phase II Project Status:
Daily Production:
Field Status:
Check back frequently for updated subsea oil and gas project info.
var txt = "Bookmark the Subsea Oil and Gas Directory";
var url = "index.htm"/*tpa=http://İnternet Adresi: www.subsea.org/*/;
var who = "Subsea Oil and Gas Directory - All Subsea Information";
var ver = navigator.appName;
var num = parseInt(navigator.appVersion);
if ((ver == "Microsoft Internet Explorer")
