Clair was discovered in North Sea in 1977 and production from 2005
by operator BP.
Clair, Scotland
Subsea Field Development Data:
Area:
North Sea
Block:
Country:
Scotland
Region:
Europe(North)
Operator:
BP
Partners:
BP 28.6%,
Conoco 24.0%,
Chevron UK 19.4%,
Enterprise Oil 18.7%,
Amerada Hess 9.3%
Topside Solution:
ClairFixed Platform
Subsea Solution:
Development Cost:
$1,140,000,000
Oil Gas Reserves:
250,000 mmboe
Clair, BP[/b], - is located 47 miles west of Shetland in approximately 140 meters of water and was considered the largest undeveloped resource on the UK Continental Shelf
The Clair field development by operator BP is located in North Sea offshore Scotland
in water depths of 140 meters .
BP with its partners started development of the Clair field in 1977.
The recoverable reserves are estimated to 250,000 mmboe. Number of subsea wells are 24. The production year is
2005 with a daily production estimate of 60,000 bopd. The Clair project is based on a
subsea solution with ClairFixed Platform topside solution. The development cost is in the order of $1,140,000,000 with an estimated field life of years.
Clair
Technical Information:
No of Wells:
24
Crude:
22-23º API
Water Depth:
140 meters
Design Pressure:
Design Temperature:
Field Life:
Clair Project Status:
Daily Production: 60,000 bopd
Field Status:
Check back frequently for updated subsea oil and gas project info.
var txt = "Bookmark the Subsea Oil and Gas Directory";
var url = "index.htm"/*tpa=http://İnternet Adresi: www.subsea.org/*/;
var who = "Subsea Oil and Gas Directory - All Subsea Information";
var ver = navigator.appName;
var num = parseInt(navigator.appVersion);
if ((ver == "Microsoft Internet Explorer")
by operator BP.
Clair, Scotland
Subsea Field Development Data:
Area:
North Sea
Block:
Country:
Scotland
Region:
Europe(North)
Operator:
BP
Partners:
BP 28.6%,
Conoco 24.0%,
Chevron UK 19.4%,
Enterprise Oil 18.7%,
Amerada Hess 9.3%
Topside Solution:
ClairFixed Platform
Subsea Solution:
Development Cost:
$1,140,000,000
Oil Gas Reserves:
250,000 mmboe
Clair, BP[/b], - is located 47 miles west of Shetland in approximately 140 meters of water and was considered the largest undeveloped resource on the UK Continental Shelf
The Clair field development by operator BP is located in North Sea offshore Scotland
in water depths of 140 meters .
BP with its partners started development of the Clair field in 1977.
The recoverable reserves are estimated to 250,000 mmboe. Number of subsea wells are 24. The production year is
2005 with a daily production estimate of 60,000 bopd. The Clair project is based on a
subsea solution with ClairFixed Platform topside solution. The development cost is in the order of $1,140,000,000 with an estimated field life of years.
Clair
Technical Information:
No of Wells:
24
Crude:
22-23º API
Water Depth:
140 meters
Design Pressure:
Design Temperature:
Field Life:
Clair Project Status:
Daily Production: 60,000 bopd
Field Status:
Check back frequently for updated subsea oil and gas project info.
var txt = "Bookmark the Subsea Oil and Gas Directory";
var url = "index.htm"/*tpa=http://İnternet Adresi: www.subsea.org/*/;
var who = "Subsea Oil and Gas Directory - All Subsea Information";
var ver = navigator.appName;
var num = parseInt(navigator.appVersion);
if ((ver == "Microsoft Internet Explorer")