Captain was discovered in North Sea in 1977 and production from
by operator ChevronTexaco.
Captain, UK
Subsea Field Development Data:
Area:
North Sea
Block:
13/22a
Country:
UK
Region:
Europe(North)
Operator:
ChevronTexaco
Partners:
Texaco North Sea UK Company (85%) and the Korea Captain Company Limited (15%).
Topside Solution:
CaptainFPSO
Subsea Solution:
Development Cost:
Oil Gas Reserves:
350 million barrels
Captain, ChevronTexaco[/b], - field has undergone a huge Phase II expansion which has increased the 60,000 barrels per day rate to an average plateau rate of 85,000 barrels per day. A new platform was installed to develop the reservoir within the eastern part of the field (Area B).
The Captain field development by operator ChevronTexaco is located 13/22a in North Sea offshore UK
in water depths of 350 feet.
ChevronTexaco with its partners started development of the Captain field in 1977.
The recoverable reserves are estimated to 350 million barrels . Number of subsea wells are 22. The production year is
with a daily production estimate of . The Captain project is based on a
subsea solution with CaptainFPSO topside solution. The development cost is in the order of with an estimated field life of 20 and 25 years.
Captain
Technical Information:
No of Wells:
22
Crude:
Water Depth:
350 feet
Design Pressure:
Design Temperature:
Field Life:
20 and 25
Captain Project Status:
Daily Production:
Field Status:
Check back frequently for updated subsea oil and gas project info.
var txt = "Bookmark the Subsea Oil and Gas Directory";
var url = "index.htm"/*tpa=http://İnternet Adresi: www.subsea.org/*/;
var who = "Subsea Oil and Gas Directory - All Subsea Information";
var ver = navigator.appName;
var num = parseInt(navigator.appVersion);
if ((ver == "Microsoft Internet Explorer")
by operator ChevronTexaco.
Captain, UK
Subsea Field Development Data:
Area:
North Sea
Block:
13/22a
Country:
UK
Region:
Europe(North)
Operator:
ChevronTexaco
Partners:
Texaco North Sea UK Company (85%) and the Korea Captain Company Limited (15%).
Topside Solution:
CaptainFPSO
Subsea Solution:
Development Cost:
Oil Gas Reserves:
350 million barrels
Captain, ChevronTexaco[/b], - field has undergone a huge Phase II expansion which has increased the 60,000 barrels per day rate to an average plateau rate of 85,000 barrels per day. A new platform was installed to develop the reservoir within the eastern part of the field (Area B).
The Captain field development by operator ChevronTexaco is located 13/22a in North Sea offshore UK
in water depths of 350 feet.
ChevronTexaco with its partners started development of the Captain field in 1977.
The recoverable reserves are estimated to 350 million barrels . Number of subsea wells are 22. The production year is
with a daily production estimate of . The Captain project is based on a
subsea solution with CaptainFPSO topside solution. The development cost is in the order of with an estimated field life of 20 and 25 years.
Captain
Technical Information:
No of Wells:
22
Crude:
Water Depth:
350 feet
Design Pressure:
Design Temperature:
Field Life:
20 and 25
Captain Project Status:
Daily Production:
Field Status:
Check back frequently for updated subsea oil and gas project info.
var txt = "Bookmark the Subsea Oil and Gas Directory";
var url = "index.htm"/*tpa=http://İnternet Adresi: www.subsea.org/*/;
var who = "Subsea Oil and Gas Directory - All Subsea Information";
var ver = navigator.appName;
var num = parseInt(navigator.appVersion);
if ((ver == "Microsoft Internet Explorer")