Hayatimdegisti.com kişisel gelişim ritmotrans telkinli Cd'leri

Hayatimdegisti.com kişisel gelişim ritmotrans telkinli Cd'leri (http://www.hayatimdegisti.com/forum/index.php)
-   Yurtdışı Firmalar (http://www.hayatimdegisti.com/forum/yurtdisi-firmalar/)
-   -   Bayu-Undan Field Development (http://www.hayatimdegisti.com/forum/yurtdisi-firmalar/531883-bayu-undan-field-development.html)

Bluesky24 18-04-2010 12:35 AM

Bayu-Undan Field Development
 




Bayu-Undan was discovered in Timor Sea in 1995 and production from 2004

by operator ConocoPhillips.









Bayu-Undan, Australia

Subsea Field Development Data:









Area:

Timor Sea







Block:

91-12 (60%) and 91-13 (40%)







Country:

Australia







Region:

Australia







Operator:

ConocoPhillips







Partners:

CococoPhilips 56.27%,

ENI 12.04%,

Santos 10.64%,

INPEX 10.52%,

Tokyo Electric Power Company/Tokyo Gas Company 10.08%







Topside Solution:

Bayu-UndanFSO









Subsea Solution:









Development Cost:

$3,300,000,000







Oil Gas Reserves:

350-400 million Data















Bayu-Undan, ConocoPhillips[/b], - was discovered in 1995 with the Bayu 1 exploration well and the Undan field was discovered later that year with the Undan 1 exploration well.

























The Bayu-Undan field development by operator ConocoPhillips is located 91-12 (60%) and 91-13 (40%) in Timor Sea offshore Australia

in water depths of 80 meters

262 feet .





ConocoPhillips with its partners started development of the Bayu-Undan field in 1995.

The recoverable reserves are estimated to 350-400 million Data. Number of subsea wells are 22. The production year is

2004 with a daily production estimate of . The Bayu-Undan project is based on a

subsea solution with Bayu-UndanFSO topside solution. The development cost is in the order of $3,300,000,000 with an estimated field life of 25 years.



















Bayu-Undan

Technical Information:





No of Wells:

22





Crude:







Water Depth:

80 meters

262 feet





Design Pressure:

100/310bar





Design Temperature:







Field Life:

25











Bayu-Undan Project Status:



Daily Production:





Field Status:













Check back frequently for updated subsea oil and gas project info.







var txt = "Bookmark the Subsea Oil and Gas Directory";

var url = "index.htm"/*tpa=http://İnternet Adresi: www.subsea.org/*/;

var who = "Subsea Oil and Gas Directory - All Subsea Information";

var ver = navigator.appName;

var num = parseInt(navigator.appVersion);

if ((ver == "Microsoft Internet Explorer")


WEZ Format +3. Şuan Saat: 03:04 PM.

Powered by vBulletin® Version 3.8.8
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.