![]() |
Gannet Field Development Gannet was discovered in North Sea in 1973 and production from by operator Shell. Gannet, UK Subsea Field Development Data: Area: North Sea Block: 21/25, 21/30, 22/21 and 22/26a Country: UK Region: Europe(North) Operator: Shell Partners: Shell (50%) and Esso (50%). Topside Solution: GannetFixed platform Subsea Solution: Cluster manifold Development Cost: £120 million Oil Gas Reserves: 13 million oil equivalent barrels Gannet, Shell[/b], - Since the original field was first discovered in 1973, a number of satellite fields have been tied into the Gannet facilities. In mid-1999, the latest phase saw Gannet G going into production with a £40 million project. Gannet lies 180km east of Aberdeen, The Gannet field development by operator Shell is located 21/25, 21/30, 22/21 and 22/26a in North Sea offshore UK in water depths of 95m. Shell with its partners started development of the Gannet field in 1973. The recoverable reserves are estimated to 13 million oil equivalent barrels. Number of subsea wells are 30. The production year is with a daily production estimate of . The Gannet project is based on a Cluster manifold subsea solution with GannetFixed platform topside solution. The development cost is in the order of £120 million with an estimated field life of years. Gannet Technical Information: No of Wells: 30 Crude: 14,000 bbl/day Water Depth: 95m Design Pressure: Design Temperature: Field Life: Gannet Project Status: Daily Production: Field Status: Check back frequently for updated subsea oil and gas project info. var txt = "Bookmark the Subsea Oil and Gas Directory"; var url = "index.htm"/*tpa=http://İnternet Adresi: www.subsea.org/*/; var who = "Subsea Oil and Gas Directory - All Subsea Information"; var ver = navigator.appName; var num = parseInt(navigator.appVersion); if ((ver == "Microsoft Internet Explorer") |
WEZ Format +3. Şuan Saat: 10:13 PM. |
Powered by vBulletin® Version 3.8.8
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.